Ximi Elga

ASME NQA-1 2008 PDF

Buy ASME NQA Quality Assurance Requirements For Nuclear Facility Applications from SAI Global. ASME NQA-1– (Revision of ASME NQA-1–). Quality. Assurance. Requirements for. Nuclear Facility. Applications. AN AMERICAN NATIONAL. American Society of Mechanical Engineers (ASME) NQA (95 addenda) and editions. The requirements of these documents shall be complied with .

Author: Arashibei Faulkree
Country: Kosovo
Language: English (Spanish)
Genre: Science
Published (Last): 26 February 2016
Pages: 469
PDF File Size: 18.20 Mb
ePub File Size: 4.32 Mb
ISBN: 814-3-95935-453-8
Downloads: 3646
Price: Free* [*Free Regsitration Required]
Uploader: Nejora

Postoperational Repairs and Modifications. Repaired items shall be reexamined in accordance with applicable procedures and with the original acceptance criteria unless the disposition has established alternate acceptance criteria. Characteristics subject to inspection and inspection methods shall be specified. The software requirements shall identify the operating system, function, interfaces, performance requirements, installation considerations, design inputs, and any design constraints of the computer program.

These documents subsequently contributed to the development of the 10 CFR Part 21 related commercial grade item definitions.

The applicable requirements of this Standard shall apply to dedication activities for acceptance. Where the cleanness of internal surfaces is evaluated by flushing, criteria shall be specified in the cleaning procedure.

The status of configuration items resulting from software design shall be maintained current. Wipe tests shall be made prior to the application of any preservative film some type of protective film may be required in order to maintain a clean carbon or low-alloy steel surface at Class B level. Where it is necessary to initially transmit design information orally or by other informal means, the transmittal shall be confirmed promptly by a controlled document. For a listing of the NQA publication history, refer to the following table: The work activities include but are not limited to managing, planning, siting investigation, design, computer software utilization, procurement, fabrication, manufacturing, installing, inspecting, testing, operating, and decommissioning.

  EL ARTE DE LA COMUNICACION BERT DECKER PDF

Special handling tools and equipment shall be inspected and tested in accordance with procedures at specified time intervals or prior to use. Requalification shall include retraining in accordance with the requirements of para.

Training shall be provided, if needed, to achieve initial proficiency, maintain proficiency, and adapt to changes in technology, methods, or job responsibilities. Yanek Subcommittee on Interfaces and Administration W. A high level of cleanness as evidenced by the following characteristics: Special process instructions shall include or reference procedure, personnel, and equipment qualification requirements.

Inspection of Steel Construction. These instructions, procedures, or drawings shall define the following, as applicable: This code or standard was developed under procedures accredited as meeting the criteria for American National Standards.

It supplements the requirements of Part I and shall be used in conjunction with applicable sections of Part I when and to the extent specified by the organization invoking Subpart 2.

The design and construction of a single storage facility, vault room, or container shall be reviewed for adequacy by a person competent in fire protection or contain a certification or rating from an accredited organization. This identification shall relate an item to an applicable design nqs-1 other pertinent specifying document.

ASME NQA EN 核电体系认证_图文_百度文库

The word should denotes guidance; the word shall denotes a requirement. Required tests, including, 2080 appropriate, prototype qualification tests, production tests, proof tests prior to installation, construction tests, preoperational tests, operational tests, and computer program tests such as software design verification, factory acceptance tests, site acceptance tests, and in-use tests shall be controlled.

Where the design has been subjected to a verification process in accordance with this Part Part Ithe verification process need not be duplicated for identical designs. These procedures shall include the responsibilities and authority of the organizations whose functions affect the configuration of the facility including activities such as operations, design, maintenance, construction, licensing, and procurement.

  LATOUR PASTEURIZATION PDF

PD635 ASME NQA-1-2008/1A-2009 Quality Assurance

The cleanness class or classes applicable to the item or specific parts of the item shall be established and specified in the applicable drawings, specifications, or other appropriate documents.

In-use test procedures shall be performed after the computer program is installed on a different computer, or zsme there are significant changes in the operating system. Such training shall include planning, performing, reporting, and follow-up asms involved in conducting audits. Such documents shall include or be supplemented with appropriate criteria from para.

Control During Installation Process. Consent to waive specified hold points shall be recorded prior to continuation of work beyond the designated hold point. Completion of corrective actions shall be verified.

NQA-1 Compliance for Nuclear Power Generation

This documentation may be combined with the documentation of the software design requirements, or the computer program nqa–1 resulting from implementation of the software design. The procurement documents shall require the Supplier to incorporate appropriate quality assurance program requirements in subtier procurement documents. Positions and Applications Matrices.

The appropriateness of assumptions; input data used; and the computer program, its associated computer hardware and system software, or other calculation method used shall also be reviewed. The responsible organization shall establish written procedures for the qualification of personnel, and for the assurance that only those personnel who meet the requirements are permitted to perform these activities.

Only authorized changes shall be made to software baselines.