Ximi Elga

BALTUR COMIST 72 PDF

COMIST 72) to run fan and a electric .. COMIST 72 N HEAVY OIL BURNERS SECTION .. Baltur reserves the right to change them without previous notice. baltur® Oil Burners are available as Gas, Light Oil, Heavy Oil and Dual Fuel. Industrial Units Available . COMIST 72 DSPGM. – COMIST DSPGM. 1) Noise levels measured in the Baltur laboratories by means of microphone positioned 1 metre behind the burner running on test boiler, at COMIST 72 N.

Author: Arashigal Nenris
Country: Saint Kitts and Nevis
Language: English (Spanish)
Genre: Medical
Published (Last): 25 April 2016
Pages: 21
PDF File Size: 13.13 Mb
ePub File Size: 10.86 Mb
ISBN: 448-7-13039-651-1
Downloads: 36994
Price: Free* [*Free Regsitration Required]
Uploader: Garr

For your own safety, please, read this user manual carefully before you initially start-up. Regulate at about 50 C the control thermostat of the resistance which is incorporated in the line filter. If balfur appropriate instruments are not available, judgement can be based on the colour of the flame. Please Double-click it, then.

Centre Hospitalier de Martigues Category: To ensure the efficiency and correct working of the equipment, it is essential to have periodic maintenance carried out by qualified technicians following the manufacturer s instructions.

This is achived by regulating where the! Lesson 1 Meeting and Greeting People. Zaferanieh Garden residential complex Category: Gear pump with pressure regulator. Flashcards Series 3 El Aeropuerto Flashcards Series 3 El Aeropuerto Flashcards are one of the quickest and easiest ways to test yourself on Spanish vocabulary, no matter where you are!

Series COMIST

A control can be carried out by looking through the spy holes situated on the back of the burner; then tighten home the screws that lock the combustion head in position. Stabilimento Coca Cola Category: Saveh Hall City Category: Force and Motion Learning Masters Early: Carefully read the comits in the booklet as they contain important information regarding safe installation, use and maintenance.

Schindler Planning parameters of high-rise elevators. The control box will be connected only when the temperature in the pre-heater reaches the value at which it has been set and causes the resistances The minimum thermostat of the pre-heater closes when the temperature reaches the value at which it has been set.

  AWWA C207 07 PDF

COMIST. Two-stage mixed gas/light oil burners.

Our instructions cover the basic requirements needed to ensure efficient operations. Mahmoudieh Residential complex Category: We advise, if possible, maintaining smoke opacity below N 6 of the Bacharach Scale even if, as a consequence, the CO 2 value is slightly lower.

In the above situation, traditional flues in terms of their diameter and heat insulation may be suitable because the significant cooling of the combustion products in these permits temperatures to comisy even below the condensation point. Heating and sanitary hot water production for Mehr Marjan residential complex, Tehran — Iran. Bwltur the shutdown efficiency at least twice. Nozzle must be ordered separately according to the burner nominal output reqired.

The hot oil circulates in clmist atomizer unit without coming out of the nozzle because the passage leading to the outward and return nozzles are closed.

Baltur BT 75 DSG 3V Brülör

These pins are pressed against their seats by strong springs which are situated at the opposite ends of the rods.

Ultra Violet cel flame scanner.

Let s start out by thinking of the English verb wash. Minimum and maximum air flow regulation for first and second stage by means of electric servomotor comiist pause closure of gate to prevent any heat dispersion to flue. Comes with 2 flexible oil pipes, 1 oil filtre, 1 flange and 1 insulating seal to connect the burner to the application. Make sure that the increase in fuel delivery occurs gradually and that maximum delivery is reached at the end of the modulation run.

Here, we will explain you briefly the steps to use your new product easily and without. The running and maintenance of the equipment must only be carried out by qualified technicians, in compliance with current regulations.

  ITEXTSHARP XMLWORKER HTML TO PDF

The relay closes and takes current to the resistances which, in turn, heat the fuel contained in the pre-heater. Memorizing math facts is an important skill for students to learn. Balfur these adjustments should be carried out when the burner is operating at maximum delivery desired.

If they do not, exchange the places of two cables of the principle line in order to inverse the baltut of rotation. In a flue that works with condensation there is valtur at the point the exhaust reaches the atmosphere when burning light oil or heavy oil or the presence of condensate water along the flue itself when gas is being burnt methane, LPG, etc.

This provides flexibility, while allowing multiple devices to be use without the. Heating and sanitary hot water production for Ministry of Agriculture Biotechnology institute co,ist, Karaj — Iran. The atomized fuel which comes out of the nozzle is mixed with air supplied by the fan and is then ignited by the spark of the electrodes. This closure is carried out by closing pins applied to the vomist of the rods.

The coomist of any components that use electricity means that certain fundamental rules have to followed, including the following: Velenjak residential complex Category: The distance between the disk and the nozzle, regulated by the manufacturer, must be reduced only if the atomized fuel cone coming out of the nozzle wets the disk and fouls it up.

If the plate is not supplied with heat insulation, it is necessary to insert an insulating balfur at least 10 mm.