Ximi Elga

BS 6262-1 PDF

Buy BS (): GLAZING FOR BUILDINGS – PART 1: GENERAL METHODOLOGY FOR THE SELECTION OF GLAZING from SAI Global. BS Glazing for buildings. General methodology for the selection of glazing. standard by BSI Group, 10/10/ This document has been replaced. BS Glazing for buildings – General methodology for the selection of glazing (No longer current but cited in Building Regulations guidance).

Author: Vudojas Brat
Country: Nepal
Language: English (Spanish)
Genre: Technology
Published (Last): 21 July 2016
Pages: 79
PDF File Size: 1.70 Mb
ePub File Size: 8.32 Mb
ISBN: 154-4-48309-881-9
Downloads: 23374
Price: Free* [*Free Regsitration Required]
Uploader: Digrel

Code of practice for energy, light and sound; — Part 3: Code of practice for fire, security and wind loading; — Part 4: For undated references, the latest edition of the referenced document including any amendments applies. However, the vibrations of 6262- first pane can be transmitted to the second pane and also via the surround. A number gs approved documents in England and Wales, technical booklets in Northern Ireland and technical handbooks domestic and non-domestic in Scotland, accompany the regulations.

In response to orders for international standards, it is BSI policy to bd the BSI implementation of those that have been published as British Standards, unless otherwise requested. Access To and Use of Buildings. BSI also holds the copyright, in the UK, of the publications of the international standardization bodies.

  HOW TO UNLOCK UNPRINTABLE PDF

BS – Glazing for buildings. General methodology for the selection of glazing

Fire Safety as amended. Information regarding online access to British Standards via British Standards Online can be found at http: General methodology for the selection of glazing; — Part 2: Theoretically, non-parallel panes should provide better acoustic insulation than parallel panes. Gives a general methodology for the selection of an appropriate choice of glass, plastics glazing sheet material and method of glazing.

The rate of fading depends on the nature of the object, the duration and intensity of the exposure and the type of radiation. Consider the following 626-21 requirements: BSWindows, doors and rooflights — Part 1: Users are responsible for its correct application.

Free to use BIM project management tool provides step-by-step help to define, manage and validate responsibility for information development and delivery at each stage of the asset life cycle in level 2 BIM 62662-1. Standards are also 2662-1 from the BSI website at http: Users of British Standards should make sure that they possess the latest amendments or editions.

The use of expensive glass and plastics glazing sheet materials should be assessed against the possibility of reduced fuel consumption and lower running costs.

BS 6262-1:2005

For guidance, see BS Superseded by BS The design requirements in 4. In particular, attention is drawn to the following statutory 62621 Conservation of Fuel and Power.

  CAE GOLD MAXIMISER PDF

Most noises are complex in that they include sounds of different frequencies bw amplitudes. Glazed areas enable daylight to be admitted to a building but at the expense of a comparatively high heat loss. Figure 1 — Sequence of design evaluation for glazed areas 6?

Protection from Falling, Collision and Impact as 62621. BSPatent glazing and shaping for buildings — Part 1: BSLoading for buildings — Part 2: Code of practice for wind loads.

There are many requirements that previously had been regarded as client-set for example, security that are being incorporated into legislation outlined in Annex A.

BSPatent glazing and sloping for buildings — Part 2: In addition to considering the risks of accidental impact, or where activities generate a special risk, the bss criteria should be taken into account: It presents the UK view on standards in Europe and at the international level.

Check and examine constraints and evaluate.